Dave and I planned the placing of the pasture fence and spacing of the posts a week ago Sunday in the rain. It took us almost 3 hours by the time we walked the property and considered areas that wouldn't hit the septic line and found less rocky areas that would work with the plan!
Later on we went to H Depot and bought 4x4x8's and 6x6x8's and loaded them on the 55 Chevy.
Last Monday, Norm's crew came with the auger to drill the holes. Because of huge rocks deeper in the ground, the placement of four posts had to be adjusted.
This afternoon the T-posts, poly tape wire, and gates were delivered!